Friday 24 February
A constant stream of visitors for the A380. I feel like the numbers increase as the week goes!
After the demonstration flight, the aircraft is rolled to a Changi airport gate to perform tests. These include going through all the moves and operations that take place at the gate in commercial operations, with the airport equipment.
 |
We had done partial tests on our first trip to Singapore but this time we did the full tests. I watched from the upper deck door, just in case, but everything went smoothly.
I left in mid-afternoon but Pascal Verneau and Mark Cousin stayed with the aircraft until it came back to the static display of the air show around 6 pm.
|
For me the tests confirm that there is no particular concern with the ground handling of the A380 for airports that are ready for it.